Datacenter details

Europe

United Kingdom

Capacity 40,000 servers.
Electrical redundancy It is close to two electric power stations, that supply it with all of the energy required for it to run.
Location South-East London (Erith)
Datacenter abbreviation ERI1
Datacenter operation date August 2017
Surface area 4,000 square meters
Address 12 Viking Way, Erith DA8 1EW

Roubaix

Capacity 136,000 servers.
Electrical redundancy 
Each datacentre has 2 separate 2 separate power supplies 
+ generators with 48hrs autonomy.
Network and fibres 
Each datacentre has 2 separate network connections 
At the heart of the 15 OVH points of presence. 
Site equipped with a 160 Gbps anti-DDoS infrastructure.
Building and rooms
 Designed to promote ventilation 
Low PUE: 1.1 in RBX4 (the lowest) 
Server water cooling system
Datacenter abbrivation RBX1 RBX2 RBX3 RBX4 RBX5 RBX6 RBX7
Address 2 Rue Kellermann, 59100 Roubaix, France
Private cloud Yes

Strasbourg

Capacity 140,000 servers.
Electrical redundancy 
Each datacentre has 2 separate 2 separate power supplies 
+ generators with 48hrs autonomy.
Network and fibres
 Each datacentre has 2 separate network connections 
At the heart of the 15 OVH points of presence. 
Site equipped with a 160 Gbps anti-DDoS infrastructure.
Building and rooms
 Designed to promote ventilation 
Low PUE: 1.1 in SBG1 
Server water cooling system
Datacenter abbrivation SBG1 SBG2 SBG3 SBG4
Private cloud Yes
Datacenter operation date Spring 2011
Address Strasbourg, Alsace, 67000

Gravelines

Capacity 400,000 servers.
Electrical redundancy
 2 separate power supplies 
+ generators with 48hrs autonomy.
Network and fibres
 Datacentre linked to 2 separate power supplies and equipped with 2 network rooms. 
At the heart of the 15 OVH points of presence. 
Equipped with 2 Cisco ASR 9922s, which can manage the flow of 400,000 servers.
Building and rooms
 Designed to promote ventilation 
Low PUE: 1.09 
Server water cooling system
Datacenter abbrivation GRA1 GRA2
Location RTE DE LA FERME MASSON, Nord-Pas-De-Calais-Picardie, 59820 Gravelines
Surface area 20,000 square meters
Datacenter operation date January 2013

Germany

Capacity 45,000 servers.
Electrical redundancy Nearby electrial substation
Datacenter stats 21st datacentre in OVH
Datacenter abbrivation LIM1
LocationLimburg (100 kilometres from Frankfurt)
Surface area 4,000 square meters
Address Dresdener Str. 54, 04758 Oschatz, Germany

North America

Beauharnois

Capacity 360,000 servers.
Electrical redundancy 
3 separate power supplies, latest generation hardware 
+ generators with 48hrs autonomy.
Network and fibres
 Datacentre linked to 2 separate power supplies and equipped with 2 network rooms. 
At the heart of the 13 North American points of presence on the OVH network. 
Site equipped with a 160 Gbps anti-DDoS infrastructure.
Building and rooms
 Designed to promote ventilation 
Low PUE: 1.09 
Server water cooling system
Datacenter abbrivaton BHS1 BHS2 BHS3 BHS4 BHS5 BHS6
Private cloud Yes
Datacenter operation date 2012
Address Beauharnois, Quebec J6N 1W5